Almost all project success is measured by the
effective and efficient use of capital to achieve the target outcome. Too often ‘efficiency’ is
measured only as a function of first cost and schedule duration. Overall
project ‘cost of ownership’ should be
evaluated against a wider range of key ‘success’ elements. Reliability, maintainability,
operability and flexibility are key elements which work hand in hand on
successful projects. MDCSystems® can help to optimize
these elements through the use of risk analysis and management studies
(Fault Tree or FMEA – Failure Mode Effect Analysis) and similar front-end
planning exercises can help to optimize the design and execution process. They
can also serve as a sort of ‘value
engineering’ session done before cost becomes an issue by identifying and
separating ‘must have’ items from ‘nice to have’ items.
MDCSystems® can develop a
Risk Analysis program and facilitate the execution, and evaluation of the Risk
Analysis study and implementation of the resulting
recommendations.
|