Client Name: Schering Plough Pharmaceutical Company
MDC® was retained by Schering Plough, a major pharmaceutical manufacturer, to evaluate the performance of the Architect/Engineer during design and construction of a multipurpose bulk pharmaceutical plant. MDC® identified errors and omissions of the Architect/Engineer and analyzed the effect of delayed and incomplete design on construction costs and completion of the plant for a major international arbitration. Technical issues involved design and fabrication of major ductwork and piping systems.