• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

MDC Systems

Providing Expert Solutions
for Projects Worldwide


PH: (610) 640.9600 | FX: (484) 301.0969

MENUMENU
  • About
  • Services
    • Construction Claims
    • Construction Management
    • CPM Scheduling/TIA®
    • Construction Dispute Resolution
    • Forensic Services
    • Expert Witness
    • Project Management
    • Risk Assessment
    • Modeling, BIM, Schedule, WUFI®
    • Energy/Sustainability Consulting
    • Government Services
    • Benchmarking
  • Professionals
  • Projects
    • Projects By Category
      • Building Diagnostics
      • Construction Claims
      • CPM Scheduling
      • Owner Issues
      • Project Management
      • Time Impact Analysis®
    • Projects by Industry
      • Commercial
      • Educational
      • Government
      • Industrial
      • Institutional
      • Pharmaceutical
  • Seminars/Training
  • Brochures
    • General Overview (PDF)
    • Forensic Engineering (PDF)
    • Schedule Analysis TIA (PDF)
    • Building Diagnostics (PDF)
    • Green Building & Sustainability (PDF)
  • News
  • Contact

Archives for August 2015

Millville Early Childhood Center

Client Name: Sambe Construction Company

Sambe Construction Company constructed a new 20,000 SF two-story building and renovated a 64,000 SF existing two-story building for the Millville Early Childhood Center. It was a competitively bid contract awarded by New Jersey State Construction Corporation (NJSCC) and was scheduled for completion on September 7, 2004.

U.S. Federal Office Building and Courthouse

Client Name: Turner Construction Company

The project consisted of approximately 300,000 sq. ft. of court/office space and underground parking. The building is 15 floors high and occupies almost an entire city block in downtown Minneapolis. The initial project price for the project’s lump-sum design/build contract between GSA and a Developer Team, including Turner Construction Co., was approximately $91 million. Of this amount, approximately $78.4 million was Turner’s construction subcontract.

Prudential Plaza, High-Rise Office Building Claims Analysis

Client Name: Turner Construction Company

MDC Systems® was retained by counsel for Turner Construction to assist in the evaluation and defense of a $60 million claim involving $14M in alleged remedial work and $23M in delay damages. MDC Systems® also assisted in prosecuting Turner’s counterclaim of $20M for the $8.6M balance due on the construction contract, plus damages.

Parking Garage Assessment

Client Name: Bristol Myers Squibb

MDC Systems® conducted a structural assessment of three, two-story, precast concrete parking garages at the Bristol Myers Squibb facility in Plainsboro, NJ. The three garage structures had experienced rapid, aggressive, premature deterioration of the garage deck, surface coating, joints and some structural elements. MDC Systems® was retained to investigate and ascertain the cause(s) of the rapid deterioration, develop a remedial plan to restore the decks to useful service, preserve and extend the useful life of the garages and to reduce their on-going maintenance costs.

Hotel Vila Olimpica (Olympic Hotel)

Client Name: The Travelstead Group

MDC Systems® provided Project and Construction Management Consulting Services for the development of a five-star hotel, office building and retail site in Barcelona, Spain.

The hotel complex included a 42-story, 456-room hotel and 29-room apartment tower surrounded by a multi-story podium containing support facilities for the hotel and apartments, a swimming pool, indoor/outdoor recreational facilities, vehicular loading dock and service areas and other amenities.

Fiber Optic Highway

Client Name: Drinker Biddle & Reath, LLP

MDC Systems® was hired by outside counsel to provide expert assistance in a matter involving the construction of a fiber optic highway extending through the states of Maryland, New Jersey, Pennsylvania and New York.

  • « Go to Previous Page
  • Go to page 1
  • Go to page 2
  • Go to page 3
  • Go to page 4
  • Go to page 5
  • Go to Next Page »

Primary Sidebar

Latest News

  • Just-In-Time Supply Chains Could be in Trouble
  • Protecting Profitability
  • Complexity: The Fifth Dimension of Project Management
  • The Different Techniques of ADR
  • The Role of a Construction Claim Consultant
  • The Benefits of CPM Scheduling
  • Standard of Care Engineering: What You Should Know
  • How Forensic Engineers Help with Building Diagnostics
  • The Importance of Critical Path Method in Project Management
  • Risk Management Tips – Utilize an Effective Design Review
  • Construction Miracles CAN Happen
  • Project Risk Management – The Real Cost of Value Engineering
  • Is the CPM Critical Path REAL or IMAGINARY?
  • Mitch Swann, PE, Named to Pennsylvania Uniform Construction Code Review and Advisory Council

Footer

Headquarters United States

MDC Systems®

1800 E. Lancaster Ave.
Suite -P Paoli, PA 19301
Map/Directions

Phone and Fax

Phone: 610.640.9600
Fax: 484.301.0969

Email

Robert C. McCue, PE
mccue@mdcsystems.com

Popular News

  • Is it time to Finally implement fire resistive residential construction in California?
  • Risk Management – Restarting the Construction Project
  • Just-In-Time Supply Chains Could be in Trouble
  • What Is A Premortem

Associations

Chartered Institute of Arbitrators
American Bar Association
American Society of Heating, Refrigerating and Air-Conditioning
International Code Council
Forum on Construction Law
Building Construction Association
National Society of Professional Engineers

©1998 by MDCSystems, Inc. MDCSystemsSM, Time Impact AnalysisSM, TIASM, Capital Project Management SystemTM, CPMSTM, Forensic Project ManagementSM, FPMSM, are services marks and/or trademarks of MDCSystems, Inc.

Copyright © 2021 · Slipstream on Genesis Framework · WordPress · Log in