• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

MDC Systems

Providing Expert Solutions
for Projects Worldwide


PH: (610) 640.9600 | FX: (484) 301.0969

MENUMENU
  • About
  • Services
    • Construction Claims
    • Construction Management
    • CPM Scheduling/TIA®
    • Construction Dispute Resolution
    • Forensic Services
    • Expert Witness
    • Project Management
    • Risk Assessment
    • Modeling, BIM, Schedule, WUFI®
    • Energy/Sustainability Consulting
    • Government Services
    • Benchmarking
  • Professionals
  • Projects
    • Projects By Category
      • Building Diagnostics
      • Construction Claims
      • CPM Scheduling
      • Owner Issues
      • Project Management
      • Time Impact Analysis®
    • Projects by Industry
      • Commercial
      • Educational
      • Government
      • Industrial
      • Institutional
      • Pharmaceutical
  • Seminars
  • Brochures
    • General Overview (PDF)
    • Forensic Engineering (PDF)
    • Schedule Analysis TIA (PDF)
    • Building Diagnostics (PDF)
    • Green Building & Sustainability (PDF)
  • MDCAdvisor®
  • Contact

Time Impact Analysis®

San Felipe Springs Water Treatment Plant, TX

The City of Del Rio, Texas had been concerned with the continuing operation of the San Felipe Springs Water Treatment Plant that was constructed in 2000. The facility had experienced piping failures on a number of occasions in the PVC piping associated with the filtration system. In addition, excessive pipe movement and the build-up of sedimentation in the piping was also a concern to the City.

Multipurpose Pharmaceutical Plant

Client Name: Schering Plough Pharmaceutical Company

MDC Systems® was retained by Schering Plough, a major pharmaceutical manufacturer, to evaluate the performance of the Architect/Engineer during design and construction of a multipurpose bulk pharmaceutical plant. MDC Systems® identified errors and omissions of the Architect/Engineer and analyzed the effect of delayed and incomplete design on construction costs and completion of the plant for a major international arbitration. Technical issues involved design and fabrication of major ductwork and piping systems.

Primary Sidebar

Latest News

  • MDCSystems® Taking Off with Commercial Drones
  • Protecting Profitability
  • Change Orders: Maximizing Benefits for Owners
  • Privatization of American Water Utilities
  • Construction Critical Path Method (CPM) Conference
  • Building Information Modeling – Boon or Bane?
  • Shipyard Contracts: New Construction vs. Ship Repair
  • Managing Capital Projects for Competitive Advantage
  • Why is there a Labor Overrun?
  • Avoiding Death by a Thousand Cuts
  • Sustainability – Un-Definable Success in a Defined World
  • Modeling of a Residential Photovoltaic System and Model Validation Using Measured Data
  • TIA® – The Rosetta Stone for Critical Path Method (CPM) Scheduling
  • Risk Management: Insuring Continuity of Supply

Footer

Headquarters United States

MDC Systems®

1800 E. Lancaster Ave.
Suite -P Paoli, PA 19301
Map/Directions

Phone and Fax

Phone: 610.640.9600
Fax: 484.301.0969

Email

Robert C. McCue, PE
mccue@mdcsystems.com

Popular News

  • Overcoming Complexity-Intellectual Foundation of the Concepts
  • CAD and Models – If 4-D is good, then 5-D must be better
  • Forensic Project Management
  • Design-Build – What Every Underwriter Should Know
  • Project Management & Project Advocacy®

Associations

Chartered Institute of Arbitrators
American Bar Association
American Society of Heating, Refrigerating and Air-Conditioning
International Code Council
Forum on Construction Law
Building Construction Association
National Society of Professional Engineers

©1998 by MDCSystems, Inc. MDCSystemsSM, Time Impact AnalysisSM, TIASM, Capital Project Management SystemTM, CPMSTM, Forensic Project ManagementSM, FPMSM, are services marks and/or trademarks of MDCSystems, Inc.

Copyright © 2022 · Slipstream on Genesis Framework · WordPress · Log in