Client Name: Sun Oil Company MDC Systems® was retained to review engineering, procurement and construction issues concerning the development of a coke (coal) manufacturing plant in Indiana. Our client’s damages stemmed from the differential movement of the sub-grade beneath the coke oven battery foundations and the failure of the coke ovens’ exhaust gas system to
Industrial
Airbag Manufacturing Facility Project
Client Name: Talley Industries MDC Systems® was retained by an airbag manufacturing company to consult and provide expert witness services for the evaluation of a $40 million claim against our client for defective design and construction of an airbag manufacturing plant. After the plant was sold to a third party, our client constructed additions and
Delaware Manufacturing Plant
Client Name: Durr Automation MDC Systems® was retained by a Prime Contractor against General Motors on a $200MM(+) expansion project. MDC Systems® assisted the prime contractor in preparing its statement of claim as well as defending itself against claims brought by their subcontractor.MDC Systems®’s analysis work involved verification of labor and equipment costs and attribution
MDC Systems® Offers Engineering Inspection Services Using Drones
MDC Systems® is currently offering Facility, Façade and Area Inspection and evaluation services in conjunction with Flexright Solutions using industrial drones and will soon add a DJI Phantom 3 Advanced drone model and imaging package to the service. MDC expects to have its own personnel FAA approved for drone operations by the Summer of 2016.
San Felipe Springs Water Treatment Plant, TX
The City of Del Rio, Texas had been concerned with the continuing operation of the San Felipe Springs Water Treatment Plant that was constructed in 2000. The facility had experienced piping failures on a number of occasions in the PVC piping associated with the filtration system. In addition, excessive pipe movement and the build-up of