• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

MDC Systems

Providing Expert Solutions
for Projects Worldwide


PH: (610) 640.9600 | FX: (484) 301.0969

MENUMENU
  • About
  • Services
    • Construction Claims
    • Construction Management
    • CPM Scheduling/TIA®
    • Construction Dispute Resolution
    • Forensic Services
    • Expert Witness
    • Project Management
    • Risk Assessment
    • Modeling, BIM, Schedule, WUFI®
    • Energy/Sustainability Consulting
    • Government Services
    • Benchmarking
  • Professionals
  • Projects
    • Projects By Category
      • Building Diagnostics
      • Construction Claims
      • CPM Scheduling
      • Owner Issues
      • Project Management
      • Time Impact Analysis®
    • Projects by Industry
      • Commercial
      • Educational
      • Government
      • Industrial
      • Institutional
      • Pharmaceutical
  • Seminars/Training
  • Brochures
    • General Overview (PDF)
    • Forensic Engineering (PDF)
    • Schedule Analysis TIA (PDF)
    • Building Diagnostics (PDF)
    • Green Building & Sustainability (PDF)
  • News
  • Contact

Projects by Industry

Airbag Manufacturing Facility Project

Client Name: Talley Industries

MDC Systems® was retained by an airbag manufacturing company to consult and provide expert witness services for the evaluation of a $40 million claim against our client for defective design and construction of an airbag manufacturing plant. After the plant was sold to a third party, our client constructed additions and modifications to the plant, increasing production capacity dramatically. Part of the plant in which the explosive pellets are manufactured was involved in a catastrophic failure.

FIT

Client Name: Dean Mead

MDC Systems® was retained by a university in Florida to develop an analysis of the events and issues that arose during the construction of the university buildings. MDC Systems® performed a comprehensive schedule analysis of the causes and liability for delay during the project. This analysis required verification of the contractor’s initial schedule and the subsequent updates to determine their accuracy and reliability as a basis for analysis.

School District Project

Client Name: Catasauqua Area School District

MDC Systems® was retained by a general contractor and a Pennsylvania school district, to analyze change orders submitted by the general contractor to the school district for excessive costs associated with the removal of rock found after excavation of the proposed site for a new high school. The new high school was first estimated with a total budget amount of $20,995,100 with actual construction costs exceeding $25,356,024. MDC Systems® determined that due to poor planning and testing by the Architect the school district was entitled to recover the excessive costs for rock removal from the Architect.

Suburban School District Energy Project

MDC Systems® was retained by a school district in Pennsylvania to investigate, analyze and recommend corrective action for the high school HVAC System due to high operating costs and unacceptable temperature conditions in various rooms of the school. The high school had been recently constructed and incorporated a geothermal field for heating and cooling uses.

University Library Project

MDC Systems® was retained by a university in New Jersey to determine if problems existed with the building design of the university library. The university had experienced problems maintaining the interior environment of the library within normally accepted ranges for this type of facility. The university suspected that the problems were the result of errors in the design of the building and its mechanical system.

Multipurpose Pharmaceutical Plant

Client Name: Schering Plough Pharmaceutical Company

MDC Systems® was retained by Schering Plough, a major pharmaceutical manufacturer, to evaluate the performance of the Architect/Engineer during design and construction of a multipurpose bulk pharmaceutical plant. MDC Systems® identified errors and omissions of the Architect/Engineer and analyzed the effect of delayed and incomplete design on construction costs and completion of the plant for a major international arbitration. Technical issues involved design and fabrication of major ductwork and piping systems.

  • « Go to Previous Page
  • Go to page 1
  • Go to page 2
  • Go to page 3
  • Go to page 4
  • Go to page 5
  • Go to Next Page »

Primary Sidebar

Latest News

  • Just-In-Time Supply Chains Could be in Trouble
  • Protecting Profitability
  • Complexity: The Fifth Dimension of Project Management
  • The Different Techniques of ADR
  • The Role of a Construction Claim Consultant
  • The Benefits of CPM Scheduling
  • Standard of Care Engineering: What You Should Know
  • How Forensic Engineers Help with Building Diagnostics
  • The Importance of Critical Path Method in Project Management
  • Risk Management Tips – Utilize an Effective Design Review
  • Construction Miracles CAN Happen
  • Project Risk Management – The Real Cost of Value Engineering
  • Is the CPM Critical Path REAL or IMAGINARY?
  • Mitch Swann, PE, Named to Pennsylvania Uniform Construction Code Review and Advisory Council

Footer

Headquarters United States

MDC Systems®

1800 E. Lancaster Ave.
Suite -P Paoli, PA 19301
Map/Directions

Phone and Fax

Phone: 610.640.9600
Fax: 484.301.0969

Email

Robert C. McCue, PE
mccue@mdcsystems.com

Popular News

  • Is it time to Finally implement fire resistive residential construction in California?
  • Risk Management – Restarting the Construction Project
  • Just-In-Time Supply Chains Could be in Trouble
  • What Is A Premortem

Associations

Chartered Institute of Arbitrators
American Bar Association
American Society of Heating, Refrigerating and Air-Conditioning
International Code Council
Forum on Construction Law
Building Construction Association
National Society of Professional Engineers

©1998 by MDCSystems, Inc. MDCSystemsSM, Time Impact AnalysisSM, TIASM, Capital Project Management SystemTM, CPMSTM, Forensic Project ManagementSM, FPMSM, are services marks and/or trademarks of MDCSystems, Inc.

Copyright © 2021 · Slipstream on Genesis Framework · WordPress · Log in