• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

MDC Systems

Providing Expert Solutions
for Projects Worldwide


PH: (610) 640.9600 | FX: (484) 301.0969

MENUMENU
  • About
  • Services
    • Construction Claims
    • Construction Management
    • CPM Scheduling/TIA®
    • Construction Dispute Resolution
    • Forensic Services
    • Expert Witness
    • Project Management
    • Risk Assessment
    • Modeling, BIM, Schedule, WUFI®
    • Energy/Sustainability Consulting
    • Government Services
    • Benchmarking
  • Professionals
  • Projects
    • Projects By Category
      • Building Diagnostics
      • Construction Claims
      • CPM Scheduling
      • Owner Issues
      • Project Management
      • Time Impact Analysis®
    • Projects by Industry
      • Commercial
      • Educational
      • Government
      • Industrial
      • Institutional
      • Pharmaceutical
  • Seminars/Training
  • Brochures
    • General Overview (PDF)
    • Forensic Engineering (PDF)
    • Schedule Analysis TIA (PDF)
    • Building Diagnostics (PDF)
    • Green Building & Sustainability (PDF)
  • News
  • Contact

Discovery – It’s Not All in the Documents

Robert C. McCue, P.E.
MDCSystems®
Consulting Engineer

Document discovery is to be anticipated and disliked on every construction litigation effort. By their nature, construction projects are paper and electronic data generation machines. How can the litigation team quickly and efficiently navigate through the voluminous and redundant files while collecting the most important documents?

One approach lies in obtaining expert technical help early to guide the discovery team toward the most likely collection of documents based upon the key issues in the case. Another may come from developing the case with the early input of the most knowledgeable project personnel. Combined, these two approaches can significantly simplify and aide in the collection and review of the necessary documents.

The contents of the document collection do not always indicate the challenges to be faced by the litigation team. Often what’s ‘not there’ can tell as much about the project as what is there.

The technical team should be able to predict the key collections of calculations, preliminary and final design documents, and vendor data necessary for the typical project of the type in question. If the collection being reviewed does not have the anticipated document types, it may indicate that assumptions replaced calculations and cost reduction goals overrode good construction practice. In other words, the necessary design and review process was not rigorously pursued.

In any event, the following document types should be part of every discovery collection; design and construction meeting minutes, request for proposal and bid documents, bid and issued for construction drawings, shop drawings, vendor data, requests for information, project e- mail files, correspondence files, and schedules. In general, the most valuable construction schedules include both the printed and electronic versions, so it can be determined which were the most significant schedules used during the work. The actual schedule logic and ties can normally be recovered from the electronic versions and they also yield a record of important changes during the course of the project.

The progression of design, bid and construction drawings and specifications will show the evolution of the design and illustrate key shifts in design, budgetary or execution philosophy. Meeting minutes and other informal correspondence can provide the history of ‘notices’ required by contract for issues such as schedule delays, additional labor requirements or cost increases where more formal correspondence has been overlooked for expediency.

MDC Systems® can help in providing solutions to these types of challenges!

Post Views: 46

You may like:

  • Much Ado About Stucco
  • The Different Techniques of ADR
  • Court Has No Jurisdiction Over a Contractor Claim that Was Based on an Issue Raised to the Contracting Officer for Final Determination but Not Sufficiently Detailed and Explained
  • Water Treatment & Distribution

Primary Sidebar

Latest News

  • Just-In-Time Supply Chains Could be in Trouble
  • Protecting Profitability
  • Complexity: The Fifth Dimension of Project Management
  • The Different Techniques of ADR
  • The Role of a Construction Claim Consultant
  • The Benefits of CPM Scheduling
  • Standard of Care Engineering: What You Should Know
  • How Forensic Engineers Help with Building Diagnostics
  • The Importance of Critical Path Method in Project Management
  • Risk Management Tips – Utilize an Effective Design Review
  • Construction Miracles CAN Happen
  • Project Risk Management – The Real Cost of Value Engineering
  • Is the CPM Critical Path REAL or IMAGINARY?
  • Mitch Swann, PE, Named to Pennsylvania Uniform Construction Code Review and Advisory Council

Footer

Headquarters United States

MDC Systems®

1800 E. Lancaster Ave.
Suite -P Paoli, PA 19301
Map/Directions

Phone and Fax

Phone: 610.640.9600
Fax: 484.301.0969

Email

Robert C. McCue, PE
mccue@mdcsystems.com

Popular News

  • Is it time to Finally implement fire resistive residential construction in California?
  • Risk Management – Restarting the Construction Project
  • Just-In-Time Supply Chains Could be in Trouble
  • What Is A Premortem

Associations

Chartered Institute of Arbitrators
American Bar Association
American Society of Heating, Refrigerating and Air-Conditioning
International Code Council
Forum on Construction Law
Building Construction Association
National Society of Professional Engineers

©1998 by MDCSystems, Inc. MDCSystemsSM, Time Impact AnalysisSM, TIASM, Capital Project Management SystemTM, CPMSTM, Forensic Project ManagementSM, FPMSM, are services marks and/or trademarks of MDCSystems, Inc.

Copyright © 2021 · Slipstream on Genesis Framework · WordPress · Log in