• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

MDC Systems

Providing Expert Solutions
for Projects Worldwide


PH: (610) 640.9600 | FX: (484) 301.0969

MENUMENU
  • About
  • Services
    • Construction Claims
    • Construction Management
    • CPM Scheduling/TIA®
    • Construction Dispute Resolution
    • Forensic Services
    • Expert Witness
    • Project Management
    • Risk Assessment
    • Modeling, BIM, Schedule, WUFI®
    • Energy/Sustainability Consulting
    • Government Services
    • Benchmarking
  • Professionals
  • Projects
    • Projects By Category
      • Building Diagnostics
      • Construction Claims
      • CPM Scheduling
      • Owner Issues
      • Project Management
      • Time Impact Analysis®
    • Projects by Industry
      • Commercial
      • Educational
      • Government
      • Industrial
      • Institutional
      • Pharmaceutical
  • Seminars/Training
  • Brochures
    • General Overview (PDF)
    • Forensic Engineering (PDF)
    • Schedule Analysis TIA (PDF)
    • Building Diagnostics (PDF)
    • Green Building & Sustainability (PDF)
  • News
  • Contact

FIT

Client Name: Dean Mead

MDC Systems® was retained by a university in Florida to develop an analysis of the events and issues that arose during the construction of the university buildings. MDC Systems® performed a comprehensive schedule analysis of the causes and liability for delay during the project. This analysis required verification of the contractor’s initial schedule and the subsequent updates to determine their accuracy and reliability as a basis for analysis. The potential impact of change orders was incorporated into the schedules to determine contractor’s entitlement to additional time as a result of scope changes. The project achieved substantial completion approximately 18 months behind schedule. MDC Systems® was also requested to determine if the standard of care was met on the part of the architects and engineers for the design of the buildings. After the completion of MDC Systems®’s evaluation, the dispute was settled on terms very favorable to our client.

Post Views: 82

You may like:

  • Submarine Pipeline
  • Middle-Eastern Medical Center
  • University Library Project
  • Hotel Vila Olimpica (Olympic Hotel)

Primary Sidebar

Latest News

  • MDCSystems® Taking Off with Commercial Drones
  • Protecting Profitability
  • Change Orders: Maximizing Benefits for Owners
  • Privatization of American Water Utilities
  • Construction Critical Path Method (CPM) Conference
  • Building Information Modeling – Boon or Bane?
  • Shipyard Contracts: New Construction vs. Ship Repair
  • Managing Capital Projects for Competitive Advantage
  • Why is there a Labor Overrun?
  • Avoiding Death by a Thousand Cuts
  • Sustainability – Un-Definable Success in a Defined World
  • Modeling of a Residential Photovoltaic System and Model Validation Using Measured Data
  • TIA® – The Rosetta Stone for Critical Path Method (CPM) Scheduling
  • Risk Management: Insuring Continuity of Supply

Footer

Headquarters United States

MDC Systems®

1800 E. Lancaster Ave.
Suite -P Paoli, PA 19301
Map/Directions

Phone and Fax

Phone: 610.640.9600
Fax: 484.301.0969

Email

Robert C. McCue, PE
mccue@mdcsystems.com

Popular News

  • Robert C. McCue, P.E., EUR ING, CEng MIEI, MCIArb.
  • Michelle Nenna Delehanty, P.E., PMP
  • Gwen Puglisi
  • Stephen M. Rymal, P.E., Esq.
  • Daniel J. Sporer

Associations

Chartered Institute of Arbitrators
American Bar Association
American Society of Heating, Refrigerating and Air-Conditioning
International Code Council
Forum on Construction Law
Building Construction Association
National Society of Professional Engineers

©1998 by MDCSystems, Inc. MDCSystemsSM, Time Impact AnalysisSM, TIASM, Capital Project Management SystemTM, CPMSTM, Forensic Project ManagementSM, FPMSM, are services marks and/or trademarks of MDCSystems, Inc.

Copyright © 2022 · Slipstream on Genesis Framework · WordPress · Log in