• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

MDC Systems

Providing Expert Solutions
for Projects Worldwide


PH: (610) 640.9600 | FX: (484) 301.0969

MENUMENU
  • About
  • Services
    • Construction Claims
    • Construction Management
    • CPM Scheduling/TIA®
    • Construction Dispute Resolution
    • Forensic Services
    • Expert Witness
    • Project Management
    • Risk Assessment
    • Modeling, BIM, Schedule, WUFI®
    • Energy/Sustainability Consulting
    • Government Services
    • Benchmarking
  • Professionals
  • Projects
    • Projects By Category
      • Building Diagnostics
      • Construction Claims
      • CPM Scheduling
      • Owner Issues
      • Project Management
      • Time Impact Analysis®
    • Projects by Industry
      • Commercial
      • Educational
      • Government
      • Industrial
      • Institutional
      • Pharmaceutical
  • Seminars/Training
  • Brochures
    • General Overview (PDF)
    • Forensic Engineering (PDF)
    • Schedule Analysis TIA (PDF)
    • Building Diagnostics (PDF)
    • Green Building & Sustainability (PDF)
  • News
  • Contact

Hotel Vila Olimpica (Olympic Hotel)

Client Name: The Travelstead Group

MDC Systems® provided Project and Construction Management Consulting Services for the development of a 5-star hotel, office building and retail site in Barcelona, Spain.

The hotel complex included a 42-story, 456-room hotel and 29-room apartment tower surrounded by a multi-story podium containing support facilities for the hotel and apartments, a swimming pool, indoor/outdoor recreational facilities, vehicular loading dock and service areas and other amenities.

Serving as the owner’s representative for the construction of Stage One of this project, the scope of work included the following services:

  • Evaluated the status of the mechanical, electrical and plumbing contracts.
  • Provided on-site management to evaluate the overall completion schedule of the project.
  • Prepared a construction completion schedule to support the opening of the main areas of the hotel in a five-month timeframe.
  • Managed construction operations under the completion schedule until opening of the hotel.

The project was successfully completed in time for the mandated opening date.

Post Views: 33

You may like:

  • Indiana Manufacturing Plant Project
  • MDC Systems® Offers Engineering Inspection Services Using Drones
  • Pakistani Gas Turbine Power Plant
  • Scheduling Project

Primary Sidebar

Latest News

  • Just-In-Time Supply Chains Could be in Trouble
  • Protecting Profitability
  • Complexity: The Fifth Dimension of Project Management
  • The Different Techniques of ADR
  • The Role of a Construction Claim Consultant
  • The Benefits of CPM Scheduling
  • Standard of Care Engineering: What You Should Know
  • How Forensic Engineers Help with Building Diagnostics
  • The Importance of Critical Path Method in Project Management
  • Risk Management Tips – Utilize an Effective Design Review
  • Construction Miracles CAN Happen
  • Project Risk Management – The Real Cost of Value Engineering
  • Is the CPM Critical Path REAL or IMAGINARY?
  • Mitch Swann, PE, Named to Pennsylvania Uniform Construction Code Review and Advisory Council

Footer

Headquarters United States

MDC Systems®

1800 E. Lancaster Ave.
Suite -P Paoli, PA 19301
Map/Directions

Phone and Fax

Phone: 610.640.9600
Fax: 484.301.0969

Email

Robert C. McCue, PE
mccue@mdcsystems.com

Popular News

  • Is it time to Finally implement fire resistive residential construction in California?
  • Risk Management – Restarting the Construction Project
  • Just-In-Time Supply Chains Could be in Trouble
  • What Is A Premortem

Associations

Chartered Institute of Arbitrators
American Bar Association
American Society of Heating, Refrigerating and Air-Conditioning
International Code Council
Forum on Construction Law
Building Construction Association
National Society of Professional Engineers

©1998 by MDCSystems, Inc. MDCSystemsSM, Time Impact AnalysisSM, TIASM, Capital Project Management SystemTM, CPMSTM, Forensic Project ManagementSM, FPMSM, are services marks and/or trademarks of MDCSystems, Inc.

Copyright © 2021 · Slipstream on Genesis Framework · WordPress · Log in