• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

MDC Systems

Providing Expert Solutions
for Projects Worldwide


PH: (610) 640.9600 | FX: (484) 301.0969

MENUMENU
  • About
  • Services
    • Construction Claims
    • Construction Management
    • CPM Scheduling/TIA®
    • Construction Dispute Resolution
    • Forensic Services
    • Expert Witness
    • Project Management
    • Risk Assessment
    • Modeling, BIM, Schedule, WUFI®
    • Energy/Sustainability Consulting
    • Government Services
    • Benchmarking
  • Professionals
  • Projects
    • Projects By Category
      • Building Diagnostics
      • Construction Claims
      • CPM Scheduling
      • Owner Issues
      • Project Management
      • Time Impact Analysis®
    • Projects by Industry
      • Commercial
      • Educational
      • Government
      • Industrial
      • Institutional
      • Pharmaceutical
  • Articles & Seminars
    • Seminars
    • Articles
  • Brochures
    • General Overview (PDF)
    • Forensic Engineering (PDF)
    • Schedule Analysis TIA (PDF)
    • Building Diagnostics (PDF)
    • Green Building & Sustainability (PDF)
  • MDCAdvisor®
  • Contact

MDC Advisor® Expert Newsletter

Thomas Hundertmark, Andre Olinto do Valle Silva, and Jeff A. Shulman

Suppliers of energy and energy-intensive commodities are greatly increasing their investments in power stations, chemical plants, oil rigs, steel mills, and other capital projects.

By raising the cost of delay and missed opportunities, today’s supercharged environment has elevated the importance of first-rate contracting management.

Many asset owners, however, are struggling. Some fail to align the work of their project teams with their long-term capital strategies. Others choose inappropriate contracting models or underestimate the organizational resources they require.

Yet a few asset owners are benefiting from better project designs, lower costs, and fewer delays. By standardizing engineering activities, modifying boilerplate contracting models, and ensuring that project teams collaborate across functional boundaries, these leaders are creating a significant source of competitive advantage. An examination of their methods offers lessons for asset-intensive industries of all stripes.

View the rest of the article below.

Managing-Capital-Projects-for-Competitive-Advantage
Post Views: 289

You may like:

  • MDCSystems® Taking Off with Commercial Drones
  • MDC Advisor® Expert Newsletter
  • MDC Advisor® Expert Newsletter
  • MDC Advisor® Expert Newsletter

Primary Sidebar

Latest News

  • MDCSystems® Taking Off with Commercial Drones
  • MDC Advisor® Expert Newsletter
  • Change Orders: Maximizing Benefits for Owners
  • Privatization of American Water Utilities
  • Building Information Modeling – Boon or Bane?
  • Shipyard Contracts: New Construction vs. Ship Repair
  • MDC Advisor® Expert Newsletter
  • Why is there a Labor Overrun?
  • Avoiding Death by a Thousand Cuts
  • Sustainability – Un-Definable Success in a Defined World
  • Modeling of a Residential Photovoltaic System and Model Validation Using Measured Data
  • Time Impact Analysis (TIA®)
  • Risk Management: Insuring Continuity of Supply
  • More Than Just Counting Rainy Days: Documenting Weather Delays

Footer

Headquarters United States

MDC Systems®

1800 E. Lancaster Ave.
Suite -P Paoli, PA 19301
Map/Directions

Phone and Fax

Phone: 610.640.9600
Fax: 484.301.0969

Email

Robert C. McCue, PE
mccue@mdcsystems.com

Popular News

  • Overcoming Complexity-Intellectual Foundation of the Concepts
  • CAD and Models – If 4-D is good, then 5-D must be better
  • Forensic Project Management
  • Design-Build – What Every Underwriter Should Know
  • Project Management & Project Advocacy®

Associations

Chartered Institute of Arbitrators
American Bar Association
American Society of Heating, Refrigerating and Air-Conditioning
International Code Council
Forum on Construction Law
Building Construction Association
National Society of Professional Engineers

©1998 by MDCSystems, Inc. MDCSystemsSM, Time Impact AnalysisSM, TIASM, Capital Project Management SystemTM, CPMSTM, Forensic Project ManagementSM, FPMSM, are services marks and/or trademarks of MDCSystems, Inc.

Copyright © 2023 · Slipstream on Genesis Framework · WordPress · Log in