• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

MDC Systems

Providing Expert Solutions
for Projects Worldwide


PH: (610) 640.9600 | FX: (484) 301.0969

MENUMENU
  • About
  • Services
    • Construction Claims
    • Construction Management
    • CPM Scheduling/TIA®
    • Construction Dispute Resolution
    • Forensic Services
    • Expert Witness
    • Project Management
    • Risk Assessment
    • Modeling, BIM, Schedule, WUFI®
    • Energy/Sustainability Consulting
    • Government Services
    • Benchmarking
  • Professionals
  • Projects
    • Projects By Category
      • Building Diagnostics
      • Construction Claims
      • CPM Scheduling
      • Owner Issues
      • Project Management
      • Time Impact Analysis®
    • Projects by Industry
      • Commercial
      • Educational
      • Government
      • Industrial
      • Institutional
      • Pharmaceutical
  • Articles & Seminars
    • Seminars
    • Articles
  • Brochures
    • General Overview (PDF)
    • Forensic Engineering (PDF)
    • Schedule Analysis TIA (PDF)
    • Building Diagnostics (PDF)
    • Green Building & Sustainability (PDF)
  • MDCAdvisor®
  • Contact

MDC Advisor® Expert Newsletter

In this edition:

  • Allocating Risks In Construction Contracts
  • Building Energy Benchmarking Program in City of Philadelphia
  • ABA Forum on Construction Industry, 2013 Fall Meeting

It’s A Risky Business – Allocating Risks In Construction Contracts

By Jennifer Evans Morris and Carrington Coleman

Allocating risk is one of the driving forces behind contract negotiation and that is never more apparent than in construction contracts. Construction contracts clarify roles and obligations, specify procedures, and, above all else, allocate risk.

Owners negotiating contracts will have different agendas (and bargaining power) than contractors and subcontractors. But, an overly aggressive owner may end up with a contract that the contractors can’t afford. And, if the contractors can’t afford it, the project ultimately will suffer. So, which provisions are the most important to negotiate and how should you negotiate them? That depends on your role. Below are five provisions that should receive significant attention.

Responsibility of Site Conditions from the Owner’s Perspective:

An owner must establish up front who is responsible for site conditions. Ordinarily, the general contractor (a “G.C”) should be responsible and should be given sufficient time to conduct a pre-bid site inspection. In the event the GC is responsible, language should be included indicating that the G.C. is responsible for unforeseen risks as well. There is a scenario where the owner may prefer to retain the risk. If the owner has unusually good knowledge about the conditions, it might be in the owner’s best interest to negotiate contract discounts and retain the risk, perhaps by insuring for the risk.

Philadelphia Fires Up Building Energy Benchmarking Program

On October 31st, commercial buildings in the city of Philadelphia will fall deeply under the spell of mandatory energy and water use reporting. The City of Philadelphia has recently sent out compliance notices to owner/operators of commercial buildings with over 50,000 square feet of indoor floor space (or mixed use buildings with at least 50,000 sf of commercial space) in accordance with the City of Philadelphia’s Building Energy Benchmarking Law which was passed in 2012. The Benchmarking Law requires the owners to compile and disclose their annual energy usage and water consumption to the City of Philadelphia. The information will then be posted on-line for access by potential investors, lessees and tenants to aid in their commercial space decision making.

The City of Philadelphia has also launched a new website which describes the law and its associated regulations along with the reporting requirements. Although the bill was signed into law in August 2012, the reporting compliance component was held off until October 31, 2013 so that the owner/operators could have some time to conform their operations protocols to the law’s reporting requirements. The reporting methodology uses the US EPA’s Energy Star Portfolio Manager as a compliance tool.

The City has also launched a new website, which describes the energy benchmarking law and associated regulations in full, including detailed reporting requirements. The city of Philadelphia has had improving the city’s energy efficiency and greenhouse gas profile as a major set of goals since the inception its Greenworks Plan in 2009. The City has made some significant strides with per capita energy consumption going down since the Greenworks benchmark year of 2006.

View HTML

Post Views: 172

You may like:

  • MDC Advisor® Expert Newsletter
  • MDC Advisor® Expert Newsletter
  • MDC Advisor® Expert Newsletter
  • MDC Advisor® Expert Newsletter

Primary Sidebar

Latest News

  • MDCSystems® Taking Off with Commercial Drones
  • MDC Advisor® Expert Newsletter
  • Change Orders: Maximizing Benefits for Owners
  • Privatization of American Water Utilities
  • Building Information Modeling – Boon or Bane?
  • Shipyard Contracts: New Construction vs. Ship Repair
  • MDC Advisor® Expert Newsletter
  • Why is there a Labor Overrun?
  • Avoiding Death by a Thousand Cuts
  • Sustainability – Un-Definable Success in a Defined World
  • Modeling of a Residential Photovoltaic System and Model Validation Using Measured Data
  • Time Impact Analysis (TIA®)
  • Risk Management: Insuring Continuity of Supply
  • More Than Just Counting Rainy Days: Documenting Weather Delays

Footer

Headquarters United States

MDC Systems®

1800 E. Lancaster Ave.
Suite -P Paoli, PA 19301
Map/Directions

Phone and Fax

Phone: 610.640.9600
Fax: 484.301.0969

Email

Robert C. McCue, PE
mccue@mdcsystems.com

Popular News

  • Overcoming Complexity-Intellectual Foundation of the Concepts
  • CAD and Models – If 4-D is good, then 5-D must be better
  • Forensic Project Management
  • Design-Build – What Every Underwriter Should Know
  • Project Management & Project Advocacy®

Associations

Chartered Institute of Arbitrators
American Bar Association
American Society of Heating, Refrigerating and Air-Conditioning
International Code Council
Forum on Construction Law
Building Construction Association
National Society of Professional Engineers

©1998 by MDCSystems, Inc. MDCSystemsSM, Time Impact AnalysisSM, TIASM, Capital Project Management SystemTM, CPMSTM, Forensic Project ManagementSM, FPMSM, are services marks and/or trademarks of MDCSystems, Inc.

Copyright © 2023 · Slipstream on Genesis Framework · WordPress · Log in