• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

MDC Systems

Providing Expert Solutions
for Projects Worldwide


PH: (610) 640.9600 | FX: (484) 301.0969

MENUMENU
  • About
  • Services
    • Construction Claims
    • Construction Management
    • CPM Scheduling/TIA®
    • Construction Dispute Resolution
    • Forensic Services
    • Expert Witness
    • Project Management
    • Risk Assessment
    • Modeling, BIM, Schedule, WUFI®
    • Energy/Sustainability Consulting
    • Government Services
    • Benchmarking
  • Professionals
  • Projects
    • Projects By Category
      • Building Diagnostics
      • Construction Claims
      • CPM Scheduling
      • Owner Issues
      • Project Management
      • Time Impact Analysis®
    • Projects by Industry
      • Commercial
      • Educational
      • Government
      • Industrial
      • Institutional
      • Pharmaceutical
  • Seminars/Training
  • Brochures
    • General Overview (PDF)
    • Forensic Engineering (PDF)
    • Schedule Analysis TIA (PDF)
    • Building Diagnostics (PDF)
    • Green Building & Sustainability (PDF)
  • News
  • Contact

Middle-Eastern Medical Center

Client Name: Hamad Medical Center

MDC Systems® was asked to undertake a detailed analysis of the mechanical system design for this middle-eastern advanced facility. The chiller plant capacity was in question given the multi-purpose use expected for this development. MDC Systems® undertook a complete evaluation of the overall energy needs for the facility to determine if the original design criteria and specifications would be adequate for the various uses of the facility. This involved an analysis of the appropriate ASHRAE design data for the location and the determination of the required outside air supply system. MDC Systems®’s work resulted in significant redesign of the mechanical system so that the facility could satisfy its future intended uses.

Post Views: 82

You may like:

  • Indiana Manufacturing Plant Project
  • FIT
  • Delaware Manufacturing Plant
  • Multipurpose Pharmaceutical Plant

Primary Sidebar

Latest News

  • MDCSystems® Taking Off with Commercial Drones
  • Protecting Profitability
  • Change Orders: Maximizing Benefits for Owners
  • Privatization of American Water Utilities
  • Construction Critical Path Method (CPM) Conference
  • Building Information Modeling – Boon or Bane?
  • Shipyard Contracts: New Construction vs. Ship Repair
  • Managing Capital Projects for Competitive Advantage
  • Why is there a Labor Overrun?
  • Avoiding Death by a Thousand Cuts
  • Sustainability – Un-Definable Success in a Defined World
  • Modeling of a Residential Photovoltaic System and Model Validation Using Measured Data
  • TIA® – The Rosetta Stone for Critical Path Method (CPM) Scheduling
  • Risk Management: Insuring Continuity of Supply

Footer

Headquarters United States

MDC Systems®

1800 E. Lancaster Ave.
Suite -P Paoli, PA 19301
Map/Directions

Phone and Fax

Phone: 610.640.9600
Fax: 484.301.0969

Email

Robert C. McCue, PE
mccue@mdcsystems.com

Popular News

  • Robert C. McCue, P.E., EUR ING, CEng MIEI, MCIArb.
  • Michelle Nenna Delehanty, P.E., PMP
  • Gwen Puglisi
  • Stephen M. Rymal, P.E., Esq.
  • Daniel J. Sporer

Associations

Chartered Institute of Arbitrators
American Bar Association
American Society of Heating, Refrigerating and Air-Conditioning
International Code Council
Forum on Construction Law
Building Construction Association
National Society of Professional Engineers

©1998 by MDCSystems, Inc. MDCSystemsSM, Time Impact AnalysisSM, TIASM, Capital Project Management SystemTM, CPMSTM, Forensic Project ManagementSM, FPMSM, are services marks and/or trademarks of MDCSystems, Inc.

Copyright © 2022 · Slipstream on Genesis Framework · WordPress · Log in